Installation
30
Powerware
®
5140 User’s Guide www.powerware.com
8. Attach the battery front panel to the chassis using the attached
screws.
Figure 21. Attaching the Battery Front Panel
9. Switch the main utility breaker on.
The UPS conducts a self-test and enters Standby mode,
indicated by the blinking
indicator.
10. Press the UPS On
button.
The load segments cycle through a startup sequence and the
UPS enters Normal mode.
NOTE The batterieschargeto 90% capacityinapproximately4 hours.However,it is
recommendedthat thebatterieschargefor 24 hoursafter installation orlongstorage.
11. If you installed an optional EBM, access the System Setup menu
and set the amp/hour rating for each EBM (see “Set Hardware
Configuration” on page 40).